Mining Sector
BHP - Yandi RGP5, Spinifex Village Camp
Mine camp accommodation cabling for BHP's RGP5 for over 2000 rooms working with BHP, FAST JV, Ausco, Decmil, Swift Networks and ADC Krone
- Designed for point to point and GPON ADC Krone network cabling architecture
- Very large installation spanning over 12 months
- 500 x 6 core SMOF SCA fibre cables to accommodation buildings
- 96 & 144 core backbone cables to central laundry locations
- 24 core fibre cables to services buildings such as administration, First Aid, gatehouse, dry mess, wet mess, internet / TV recreation room
- All fibre cables tested with OTDR and GPON tester
- Cat6 copper cabling internally for administration and services buildings
- Fibre cabling to support IP telephones, digital entertainment systems, ethernet LAN networks, fire protection systems and security
Fortescue Metals Group (FMG) - Cloud Break Mine, Newman
Cable installation for new mine. Fibre optic installation.
- 24 and 48 core fibre optic and communications cabling facilities for process control
- Marshalling and LAN systems
- Continual design change through construction and tight time frames
- 1000's of spliced terminations on site
- Project completed over 2 years
Woodside Petroleum![]()
Fibre optic and copper cabling, terminations and testing for Woodside's LNG4 & 5 gas trains and Woodside's Pluto gas train
- Thousands of fusion spliced fibre optic terminations to support ethernet LAN network, gas plant process control systems, CCTV, fire protection systems, security and access control systems and other services
- Gas plant cabling and terminations on both live gas plant and construction site
- Temporary construction building fibre and copper cabling
- Permanent facilities building fibre and copper cabling
- Working with Woodside, Foster Wheeler Worley and construction contractors for over 10 years on various Woodside projects both onshore and offshore
Project Sector
(to be updated)
Service Sector
Department of the Attorney General - Justice Department![]()
Cable installation, service and maintenance state wide over the past 10 years
- Installation of cat5e and cat6 data outlets
- Installation of fibre backbone cabling, telephone backbone cabling, power and earthing of communications equipment
- Administration buildings, court houses, prisons, detention centres
- Statewide coverage from Esperance to Kununurra
Hakea Prison - Security upgrade project
Installation of Emtelle blown fibre optic network for Hakea Prison new security system working with SKM, Chubb Security and Department of the Attorney General
- Emtelle blown fibre optic tubes installed in a working prison system to all building locations
- Emtelle blown fibre optic cores installed via a compressed air system to all locations
- Fusion spliced terminations
- OTDR tested ready for security system to be commissioned
Tiwest Joint Venture and Kerr McGee Mineral Sands operations
Electrical, instrumentation, communications and fibre optic installations over the past 16 years
- 5 sites - administration, process plants and warehousing sites from Kwinana, Henderson, Muchea, Cataby and Bentley
- Installations carried out inside an operating plant
- All works performed to the strictest OHS requirements
Rio Tinto - Operations Centre, Perth Domestic Airport
Working with Rio Tinto, CBRE, NDY and Alan Jones Electrical for the installation of Panduit copper and fibre optic network structured cabling system over 4 floors for Tio Tinto's main operations centre
- 1200 Panduit cat6a copper structured cabling outlets
- Cat6a consolidation points and system leads to workstations
- Fibre optic backbone cabling and links to adjacent operations building
- Tested to 10gig standards
Flight Centre Stores
Working with One Group Retail Shopfitters and Flight Centre to install voice, data, electrical and equipment installation for new branch stores over the past 10 years
- Installed and refurbished over 85 store locations in Western Australia
- Installed over 3500 voice and data outlets
- Installed all data, telephone, electrical and lighting outlets
- Completed within strict timeframes, one store fit-out completed every two weeks
Coles Myer Group
Working with DESA Australia and Coles Myer Group to install voice, data and electrical installation for picking and conveyor systems and AP wireless network
- Installation of electrical and communications for the control of picking and conveyor systems
- Installed 325 RF wireless access points
- 65 store installations as part of a 540 store national rollout
- All work was completed after hours and in various remote areas across the state
- Completed within strict timeframes, one store every 12 hours
- The project was completed over a 5 month period
- Completed within timeframe and within set budget